Enbridge moving towards putting an old pipeline back into service in the NWT
Enbridge has plans to put back into operation a pipeline that has been shut down since 2016. Line 21 was closed because it sat on the unstable ground by a riverbed.
Enbridge has plans to put back into operation a pipeline that has been shut down since 2016. Line 21 was closed because it sat on the unstable ground by a riverbed.
Signup to our newsletter and receive this week's top stories every Saturday morning.